سه شنبه 01 فروردین 1402 - 2023 Mar 21
Tehran - Shomal freeway Company
Tehran - Shomal freeway Company
About Lot Three

Route of lot Three:

This lot starts from Pol-e-Zangouleh To Dasht-e-Nazir Y track with 47 kilometers length that  includes two main lanes and a slow lane  in the slopes.
- The maximum road slope is 6 percent and the minimum radius of arcs is 450 meters.


Main operational volumes of lot Three on Round Trip Basis:

 

  •  92  Tunnels with 33.5 Km length

  •  38  Bridges with 6.4 Km length

  •  13  Million m3  earth works

 

 

 

© All rights are resereved for Tehran - Shomal freeway Comapny. Designed by Dotech Powered By Dotech