چهارشنبه 26 آذر 1404 - 2025 Dec 17
Tehran - Shomal freeway Company
Tehran - Shomal freeway Company
About Lot Three

Route of lot Three:

This lot starts from Pol-e-Zangouleh To Dasht-e-Nazir Y track with 50 kilometers length that includes two main lanes and a slow lane  in the slopes.
- The maximum road slope is 6 percent and the minimum radius of arcs is 600 meters.


Main operational volumes of lot Three on Round Trip Basis:

 

  •  44 Tunnels with 59.3 Km length

  •  44  Bridges with 7.4 Km length

 

 

 

 

© All rights are resereved for Tehran - Shomal freeway Comapny. Designed by Dotech Powered By Dotech