جمعه 31 فروردین 1403 - 2024 Apr 19
Tehran - Shomal freeway Company
Tehran - Shomal freeway Company
About Lot Three

Route of lot Three:

This lot starts from Pol-e-Zangouleh To Dasht-e-Nazir Y track with 52 kilometers length that includes two main lanes and a slow lane  in the slopes.
- The maximum road slope is 6 percent and the minimum radius of arcs is 450 meters.


Main operational volumes of lot Three on Round Trip Basis:

 

  •  44 Tunnels with 71 Km length

  •  44  Bridges with 8.1 Km length

 

 

 

 

© All rights are resereved for Tehran - Shomal freeway Comapny. Designed by Dotech Powered By Dotech